For Sale: Simple Cycle and Combine Cycle Turbine Packages
For Sale: Simple Cycle and Combine Cycle Turbine Packages
Simple Cycle and Combine Cycle Packages
In Storage and Available for Immediate Delivery
TAI Exclusive: 2-GE 7F.05 GTG packages (225mw ISO each)
TAI Exclusive: 1-GE 7F.05 GTG packages (225mw ISO)
TAI Exclusive: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160mw ISO)=360MW in Combine Cycle.
TAI Exclusive: 1-Rolls-Royce Trent Turbine and 1 Siemens SST300 STG=77MW in Combine Cycle
TAH owned: 1-GE LMS100 PARTS-Supercore and Power Turbine SOLD (100mw ISO)
2xGE 7F.05 GTG packages, Built in 2016
(450mw TOTAL: 225mw ISO each)
GTG packages, Built in 2016 image
Zero ''0'' Hours, Never Used
DLN 2.6+ Combustion Technology
GE Mark VIe Control System
Water-to-Air Fin Fan Cooling
7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers
Static Starter - one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs
2-Exhaust stacks with silencer: 19.5 feet diameter and 135 feet height
Ancillary equipment
Lube oil conditioner
Complete GE engineering package
1xGE 7F.05 Gas Turbine Generator Package 225MW
Rolls-Royce Gas Turbine Generator Package Siemens SST-300 Steam Turbine Generator Zero ''0'' Hours, Never Used
ROLLS ROYCE USA, OHIO MANUFACTURED TRENT 60 GAS TURBINE GENERATOR SET.
• Manufactured in 2016, delivered in August 2017
• 60MW AT SITE CONDITIONS
• DLE Dry Low Emissions
• Cold start to full power in under 10minutes
• 50Hz, but easily convertible to 60Hz
• Engine still preserved in original shipping container
• An aeroderivative gas turbine.
SIEMENS STEAM TURBINE GENERATOR SST-300 C2S/C160
• Manufactured in 2016, delivered in August 2017
• Output 17.92MW AT SITE CONDITIONS
• Speed 7059 RPM
• Admission Steam Temperature 400 Degrees C
• Admission Steam Pressure 30 bara
• Exhaust Pressure 0.07 bara
• Rotation- Right; Seen in Steam Flow Direction
1 on 1 Combine Cycle Asset: 360MW
1xSGT6-5000F and 1xAlstom Steam Turbine Generator
Unused GE LMS100 GTG Package
Never Used, Zero ''0'' Hours
Package built in 2009
Supercore and Power Turbine SOLD
Please ask for a list of remaining items.