SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


LIST of Secondary Market Turbine Packages for Sale


LIST of Secondary Market Turbine Packages for Sale

Inquire

Catalog #93941

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: April 04, 2018 22:39

LIST of Secondary Market Turbine Packages for Sale



Gas Turbine Generator Packages & More

In Storage and Available for Immediate Delivery prices will only be given if you confirm you have a genuine project please name destination and that end user is RWA !!!

TAH owned: 1-GE LMS100 60HZ GTG package (100mw ISO)

TAH owned: 2-GE 7EA GTG packages (85mw ISO each)

TAI Exclusive: 1-GE 7F.05 GTG packages (225mw ISO)

TAI Exclusive: 2-GE 7F.05 GTG packages (225mw ISO each)

TAI Exclusive: 1-Solar Titan130S & Rentech Boiler(15mw ISO)

TAI Exclusive: 1 on 1 CC: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160MW ISO)



2 GE 7EA (PG7121) GTG packages (85mw ISO each)



OUTPUT: 85MW ISO on natural gas

Heat Rate: 10,430 Btu/Kwh

Current Fuel Set Up: Dual Liquid Fuel:

1. Crude(Primary Fuel) and Distillate (Back up)

Can be converted to natural gas for an additional cost.

Utilizing water injection NOx combustion technology

Single nozzle combustion system

MARK VI Control System

Generator (ELIN) Totally Enclosed Water to Air Cooled

60Hz, 13.8kV, .95 Power Factor Capable

Zero ,0, Hours, Never Used



2 GE 7F.05 GTG packages, Built in 2016

(450mw TOTAL: 225mw ISO each)



Zero ,0, Hours, Never Used

DLN 2.6+ Combustion Technology

GE Mark VIe Control System

Water-to-Air Fin Fan Cooling

7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers

Static Starter - one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs

2-Exhaust stacks with silencer: 19.5 feet diameter and 135 feet height

Ancillary equipment

Lube oil conditioner

Complete GE engineering package



CHP: Solar Titan 130S GTG package & Rentech HRSG



Condition: New: Zero ,0, Hours

Under Warranty: No – To be extended

Shipped: November 2015

Storage: Heated and Enclosed Warehouse

FOR CO-GENERATION or CHP APPLICATION: Solar Turbine comes with Rentech Heat Recovery Steam Generator with Duct Burner



GE LMS100 GTG Package (2013 Supercore)



Never Used, Zero ,0, Hours

Supercore built in 2013

Package built in 2009

Can be converted to Dual Fuel and 50Hz at minimal additional costs

We can quote an AS NEW package or Turnkey EPC Installed Number



GE 7F.05 Gas Turbine Generator Packages



One GE 7F.05 Gas Turbine Generator Set

Built in 2014, Zero ,0, Hours, Never Used

DLN 2.6+ Combustion Technology

GE Mark VIe Control System

Water-to-Air Fin Fan Cooling

7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers

Static Starter - one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs

Ancillary equipment

Lube oil conditioner



1 on 1 Combined Cycle Assets: Siemens GTG Package and Alstom STG



1 on 1 Combined Cycle: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160MW ISO)

GT Built in 2008 and STG Built in 2006, both never used=Zero ,0, Hours





























Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

CRAFTSMAN 3650 Watt Portable Gasoline Generator with 8-in Wheels and Handle. 2015 Volvo EC380EL Excavator 2016 CAT D7E Dozer Cat 988B Loader 2015 Genie 5519 Telehandler