LIST of Secondary Market Turbine Packages for Sale
LIST of Secondary Market Turbine Packages for Sale
Gas Turbine Generator Packages & More
In Storage and Available for Immediate Delivery prices will only be given if you confirm you have a genuine project please name destination and that end user is RWA !!!
TAH owned: 1-GE LMS100 60HZ GTG package (100mw ISO)
TAH owned: 2-GE 7EA GTG packages (85mw ISO each)
TAI Exclusive: 1-GE 7F.05 GTG packages (225mw ISO)
TAI Exclusive: 2-GE 7F.05 GTG packages (225mw ISO each)
TAI Exclusive: 1-Solar Titan130S & Rentech Boiler(15mw ISO)
TAI Exclusive: 1 on 1 CC: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160MW ISO)
2 GE 7EA (PG7121) GTG packages (85mw ISO each)
OUTPUT: 85MW ISO on natural gas
Heat Rate: 10,430 Btu/Kwh
Current Fuel Set Up: Dual Liquid Fuel:
1. Crude(Primary Fuel) and Distillate (Back up)
Can be converted to natural gas for an additional cost.
Utilizing water injection NOx combustion technology
Single nozzle combustion system
MARK VI Control System
Generator (ELIN) Totally Enclosed Water to Air Cooled
60Hz, 13.8kV, .95 Power Factor Capable
Zero ,0, Hours, Never Used
2 GE 7F.05 GTG packages, Built in 2016
(450mw TOTAL: 225mw ISO each)
Zero ,0, Hours, Never Used
DLN 2.6+ Combustion Technology
GE Mark VIe Control System
Water-to-Air Fin Fan Cooling
7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers
Static Starter - one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs
2-Exhaust stacks with silencer: 19.5 feet diameter and 135 feet height
Ancillary equipment
Lube oil conditioner
Complete GE engineering package
CHP: Solar Titan 130S GTG package & Rentech HRSG
Condition: New: Zero ,0, Hours
Under Warranty: No – To be extended
Shipped: November 2015
Storage: Heated and Enclosed Warehouse
FOR CO-GENERATION or CHP APPLICATION: Solar Turbine comes with Rentech Heat Recovery Steam Generator with Duct Burner
GE LMS100 GTG Package (2013 Supercore)
Never Used, Zero ,0, Hours
Supercore built in 2013
Package built in 2009
Can be converted to Dual Fuel and 50Hz at minimal additional costs
We can quote an AS NEW package or Turnkey EPC Installed Number
GE 7F.05 Gas Turbine Generator Packages
One GE 7F.05 Gas Turbine Generator Set
Built in 2014, Zero ,0, Hours, Never Used
DLN 2.6+ Combustion Technology
GE Mark VIe Control System
Water-to-Air Fin Fan Cooling
7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers
Static Starter - one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs
Ancillary equipment
Lube oil conditioner
1 on 1 Combined Cycle Assets: Siemens GTG Package and Alstom STG
1 on 1 Combined Cycle: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160MW ISO)
GT Built in 2008 and STG Built in 2006, both never used=Zero ,0, Hours