SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


77 MW Frame 6B ( PG 6561B) CCGT plant - Ref : P/Q1 -7.2


77 MW Frame 6B ( PG 6561B) CCGT plant - Ref : P/Q1 -7.2

Inquire

Catalog #174360

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: February 07, 2025 21:24
Page Views: 104

77 MW Frame 6B ( PG 6561B) CCGT plant - Ref : P/Q1 -7.2

The object of sale includes the following main components on which the following work has been carried out:



Frame 6 B gas turbine PG 6561B, LEC upgraded Thomassen, Serial No. 296867 converted in 2009 from Syngas to LEC natural gas combustion system

GT transmission, BHSAD 66 USO

Generator Alstom T 214-234

GT controller system (Mark V)

Co2 fire extinguishing system of the gas turbine

Heat recovery steam generator, standard boiler Duisburg 4x4 sygas-fired additional burner

Main steam turbine, double extraction - contensation turbine

ABB Turbine Nürnberg GmbH, type VEE 40

Boiler feed water pumps 1 and 2 Sulzer Pumps Germany

Contensation steam turbine SST 060, Siemens Turbomachinery

Cooling water pumps 1 and 2 and 3 KSB AG Dt.,

Cell cooling turbine 1 and 2, GEA Energietechnik GmbH

Full desalination plant 2.9 sqm, Hager and Elsässer GmbH



this also includes:

Housing gas turbine generator set with filter house

Gas turbine machine transformer 10/30 KV; 55 MVA, Pouwels

Heat recovery steam generator with gas turbine - flue gas duct and chimney

Machine house - steel structure, isopanels

Steam turbine machine transformer 10/30 KV; 37.5 MVA

both cell coolers

Gas reducing station - without the building itself

Double girder overhead traveling crane 25 to. and 6.3 tons,

Elevator boiler house 500 ZPP, GEDA -



During the conversion of the GUD to natural gas, the following work was carried out on the main units

Gas turbine

Hot gas path inspection

Exchange of the 10 transition pieces

Exchange of the 10 burners with cross ignition tubes

Exchange of the guide and blades of all 3 stages

Installation of a LO Nox system

Adaptation of the control to the new driving style (software change)

Transmission revision

Refilling the turbine oil



In 2010 a 3-stage air filter was installed

Gas turbine generator

pull large revision with inductor

Insulation measurements

The conversion of the GT was carried out by Ansaldo Thomassen.



Steam turbine

open the turbine

Bring runners to the factory, material tests, blasting, sheet metal, balancing

Reseal parting joint

Close withdrawals that are no longer required

Realignment of the runner

Renewal of sealing steam control

New turbine control and adaptation to the steam turbine generator control system

The same work was carried out on the generator as on the GT generator.

The revision work was carried out by Turbomaschinen (TMS).



Waste heat boiler

The AHK received a water pressure test

Comprehensive material tests were carried out

All TÜV-relevant tests including the associated containers and pipelines



The necessary documentation is available for all work carried out, from which further details can be found.

All specialist companies involved in the general overhaul and technical renewal can confirm that the power plant complies with current technical requirements, including environmental requirements.

Dismantling and rebuilding can be offered separately by us.



The price is Euro 2.95 million as is where is

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

S03032025-34 GE LM2500G4,year:2013,11kv,35.5mw,50hz,hours:650 2012 Cummins 150KW standby Natural Gas Generator Cummins 1250KW / KTA50-G3 standby Generator 600KW / CAT 3412 Diesel Generator Cummins 1000KW Standby Generator, Cummins QST30-G5 engine! 479 Hours! 1100KW Cummins, Onan QSU81, Natural Gas Generator 15 - 2023 Kalmar 4X2 Spotter Trucks