OFFER Nr.1 of 2 Identical Power Plants: ANSALDO | ENERGIA - AE94.2 GAS TURBINE POWER PLANT PACKAGE
OFFER Nr.1 of 2 Identical Power Plants: ANSALDO | ENERGIA - AE94.2 GAS TURBINE POWER PLANT PACKAGE
Back on market buyer failed
OFFER Nr.1 of 2 Identical Power Plants:
ANSALDO | ENERGIA - AE94.2 GAS TURBINE POWER PLANT PACKAGE
Manufacturer: Ansaldo Energia
Location: FOB Tianjin Port, China
Offer Validity: Subject to formal LOI and financial confirmation
Our Negotiated Offer Price: USD $ 49 Million USD (Forty-Nine Million US Dollars)
TECHNICAL SPECIFICATIONS
Gas Turbine
Model: AE94.2
Manufacturer: Ansaldo Energia
Year of Manufacture: 2017
Operating Hours: 0 (unused)
Voltage: 18 kV
Frequency: 50 Hz
Configuration: Single-shaft, dual external combustion chambers
Output Capacity: 185 MW
Generator Model: QF-180-2
Generator Manufacturer: Shanghai Electric
Steam Turbine
Model: QF-100-2
Manufacturer: Shanghai Electric
Output Capacity: 100 MW
Additional Steam Turbine Capacity: 18 MW
Voltage: 10.5 kV
HRSG (Heat Recovery Steam Generator)
Model: NG-AE94.2-R
Manufacturer: Hangzhou Boiler Factory
Steam Output: 241.1 t/h
Steam Temperature: 517°C
Maximum Pressure: 8.89 MPa.G
TOTAL INSTALLED CAPACITY
Component
Capacity (MW)
Gas Turbine Generator
185 MW
Steam Turbine Generator
100 MW
Auxiliary Steam Turbine
18 MW
Total Net Capacity
303 MW
COST BENCHMARK & SAVINGS ANALYSIS
Industry Benchmark for New Equipment: $1.4 million per MW × 303 MW = $424.2 million USD
Offered Price (FOB Tianjin): $51 million USD
Total Savings: $424.2 million - $51 million = $373.2 million USD
This represents a cost reduction of approximately 65%–70% compared to new equipment pricing, with zero operating hours and full scope inclusion.
PACKAGE SCOPE
Includes but is not limited to:
Gas turbine and alternator
Steam turbine (100 MW + 18 MW) and alternator
HRSG system
Lube oil system
Gas addition system
Water treatment unit
Steam tank
Chimney and exhaust tube
Firefighting system
High-voltage and low-voltage switchgear
MCC (Motor Control Center)
HV compartment
Transformer
Full control system
REQUIRED BUYER DOCUMENTATION
To initiate formal engagement and secure inspection rights, the following documents are required:
1. Letter of Intent (LOI)
Issued on buyer’s official letterhead
Must state intent to purchase the AE94.2 power plant package with price acceptance
Include buyer’s legal name, address, and authorized signatory
Specify target timeline, inspection conditions, and payment terms
Signed and dated
2. Proof of Funds (POF)
Bank-issued document confirming financial capacity
Must reflect availability of at least USD $51 million
Accepted formats: bank statement, RWA letter, or SWIFT MT799
Issued within the last 10 banking days
Must include bank officer contact details
3. Bank Comfort Letter (Optional but Preferred)
Issued by a Tier-1 bank
Confirms buyer’s readiness to engage
Indicates willingness to issue payment instrument upon contract finalization
4. Inspection . USD 2,000,000.00 into escrow 100% refundable if not as presented