For Sale Siemens SGT-600 Core Engine 60Hz - New, Unused – Immediate Availability
For Sale
Siemens SGT-600 Core Engine 60Hz - New, Unused – Immediate Availability
Offer Summary
We are pleased to present an exclusive opportunity to acquire a brand-new Siemens SGT-600 Core Engine at a significantly reduced price compared to OEM replacement cost.
Item Details
OEM Replacement Value € 35 Million EUR per turbine (plus premiums)
OEM Production Lead Time 18–24 months with 50% deposit required
Our Offer Price per Unit € 16.9 Million EUR – Immediate availability
Units Available Only 1 unit remaining from 4
Preservation Method Engine stored in Nitrogen Preservation Containers
Mechanical Drives Stored in separate dedicated containers
Buyer Priority Buyer of first unit receives priority access to remaining 3 units
Escrow Arrangement Transaction to be executed via escrow for buyer protection and compliance
Technical Highlights
Model: Siemens SGT-600 Core Engine
Nominal Output: 25 MW shaft ISO / 45 MW heat
Exhaust Flow: 80 kg/s at 540°C
Ambient Range: -15°C to +42°C
Combustion System: Dry Low Emission (DLE)
Seismic Zone: UBC Zone 4
Area Classification: Offshore Zone 1 IIB T3 (also suitable for Zone 2)
Scope of Supply and Terminal Points
Part 1 – General
The scope of supply defines a functioning unit within the specified terminal points.
Alternative configurations are available upon request.
Part 2 – Technical Specification
Application: Spare Core
Nominal Output:
25 MW shaft power (ISO: 15°C, sea level, no inlet/exhaust pressure losses, 60% relative humidity)
45 MW heat output (ambient condition dependent)
Exhaust gas flow: 80 kg/s at 540°C
Design Conditions: Ambient temperature range from 15°C to +42°C
Seismic Zone: UBC Zone 4
Area Classification:
Electrical material rated for offshore Zone 1 IIB T3 during normal operation
Electrical equipment energized after loss of enclosure ventilation remains suitable for Zone 1
Combustion System: Dry Low Emission (DLE) technology
Strategic Advantage
This offer enables immediate acquisition of a high-performance turbine, bypassing OEM delays and deposit requirements. The unit is new, preserved, and ready for deployment. No comparable offer exists in the market today.
We are offering only one unit initially to validate buyer capability and ensure a smooth transaction. Upon successful completion, the buyer will receive exclusive priority to acquire the remaining three units.
All financial transactions will be conducted via Swiss escrow, ensuring full compliance, transparency, and buyer protection.
Required Buyer Documentation
To initiate formal engagement and secure inspection rights, the following documents are required:
1. Letter of Intent (LOI) & Mandate to our firm
Issued on buyer’s official letterhead
Must state intent to purchase and price acceptance
Include buyer’s legal name, address, and authorized signatory
Specify target timeline, inspection conditions, and payment terms
Signed and dated
2. Proof of Funds (POF)
#serk