Siemens SGT5 -2000 E - Combined Cycle Power Plant - 670 MW - Highly suitable for Data Center Application - ZERO Hours
Siemens SGT5 -2000 E - Combined Cycle Power Plant - 670 MW - Highly suitable for Data Center Application - ZERO Hours
Back on market Buyer failed
Siemens Turbines:SGT5-2000E,year:2012 , Dry Low Nox
Each power:166 MW ,10.5 KV,50 Hz
Total Firing Hours : Zero
Fuel : Natural Gas
With steam turbine,steam turbine alternator
Still some components are in Original crates
Total power of each unit:166 MW +57.3 MW =223.3 MW
3 Modules x 223.3 = 670 MW
Scope:Turbine+Alternator+Cooler+Lube+Added Gas+Water treament+Steam tank+steam turbine+HRSG+Steam turbine alternator+Chimney+Tube+Fire fighter+transformer+Control
+High volt cabine+low volt cabine+mcc+Hv comp art
Price : USD 137. Million FOB China Port
This price includes Cost of the plant / Equipments,dismantling,packing ,transport to the Port and FOB.
Full export documentation , Custom clearance , Obtaining Export permits
Scope of Supply ;
3xSiemens SGT5-2000E packages
1.scope:
SGT5-2000E (V94.2) gas turbine + Generator, 2 sets
with original packages from manufacturer. 1 set
original packages opened; no installation done.
2. Technical
Output 166MW @ 50Hz each GT
SGT5-2000E(V94.2) GTG is as below
Engine SGT2000-E Gas Turbine
Manufacturer: Siemens
Fuel Type NG
Burner Dry low Nox
Year of Manufacture 2012
Total Firing Hour 0 hour, no commissioning/erecting done.
1) 3 Nos Siemens SGT5 - 2000E Turbines + Alternators + All Turbine accessories ( 3 Sets )
2) 3 Nos Siemens Steam Turbines + Alternators + All Steam Turbine accessories ( 3 Sets )
3) 3 Nos HRSG Sets + ACCESSORIES
4) Cooler
5) Lube
6) Added Gas Treatment Plant
7) Water Treatment Plant
8) Steam Tank
9) Transformer Sets
10) Central Control unit
11) High Voltage Cabinet
12) Low Voltage Cabinet
13) MCC
14) Fire Fighter units
15) HV Complete Art
16) Chimney Units
17) All available spares / Tools
18) Full set of Operating Manuals , Data Books in English
Delivery : 3 Months after Advance Payment
Inspection : Can be arranged , subject to Terms .
Buyer has to pay our representative Travel expenses which will be deducted in case of successful transaction .
LOI / POF is required in the form of MT 799 SWIFT from Buyer bank to Seller bank .
Payment :
1) 10% deposit into escrow
2) 20% Advance after inspection / Boroscope and upon signing binding contract
2) 25% When equipments are ready for dismantling
3) 20% When 50% Dismantling is completed
4) 25% When ready for transport to the Port
Enclosure : Photos / Video / Turbine specifications
#sam