Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


Mobile Waste-to-Energy Plant - made in Malta


Mobile Waste-to-Energy Plant - made in Malta

Inquire

Catalog #183014

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: May 08, 2026 22:44
Page Views: 154

Mobile Waste-to-Energy Plant - made in Malta



Project Mobile Waste-to-Energy Plant - Malta

• Cost recovery within 2 years (1.6-year simple cost recovery)

• Internal rate of return (IRR) of 57% - significantly higher than typical infrastructure projects

Investor capital contribution: €72.5 million

• Annual waste processing rate: 280,000 metric tons

• Net electricity generation (after self-consumption): 108,000 MW/year

Business Plan

Mobile Waste-to-Energy Plant - Malta

Production capacity: 280,000 metric tons/year, 15 MW (6 x 2.5 MW) + 2 MW for self-consumption (Rankin organic cycle)

Executive Summary

Project: Construction and operation of a mobile thermal treatment plant for municipal solid waste with electricity generation.

Production capacity:

• 6 main lines, each with a capacity of 2.5 MW (total 15 MW) for exporting power to the grid.

Project: Construction and operation of a mobile thermal treatment plant for municipal solid waste with electricity generation.

Production Capacity:

• 6 main lines, each with a capacity of 2.5 MW (total 15 MW) for exporting power to the grid.

• An additional 2 MW Rankine organic cycle unit to cover the plants consumption (automatic backup).

Waste Treatment Rate: 280,000 tons/year.

Technology: Pretreatment ? Granulation ? Pyrolysis ? High-temperature post-combustion (1200-1400°C) ? Rankine organic cycle (48% electrical efficiency) ? Inert gas arc welding filtration ? Closed-loop gas cleaning (zero atmospheric emissions, no chimney). Residual ash content: 1.5-5%.

Location: Maghtab landfill (EcoHive), by agreement with WestServ.



Required

1. Non-Disclosure Agreement (Arbitration in Malta).

2. Business Plan/Terms of Reference/Follow-up Plan.

3. Financial Model (with charts)/Investors Economic Justification (100% Funding)/Detailed Implementation Plan with Gantt Chart (HTML).

4. Official Letter from the Investor with Proof of Financial Capacity.

5. Project Financing Agreement with the Investor.

6. Invitation Letter for a Meeting with the Authorities.

7. Visit to Malta to Review Project Details, Meet with a Maltese Representative, and Register the Company in Malta.



note :

After signing the Non-Disclosure Agreement (Arbitration in Malta),

and receiving the Official Letter from the Investor,

you will be provided with the project documents and the procedures will be completed.



#serk

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

For Sale - Ref S27062026 3 units CAT 3516 C - Year 2025 - Zero Hours For Sale - Ref S26062026-2 Swiss Manufactured High-Speed Reduction Gearboxes for GE LM2500 (60Hz) 1995 CAT 938F Wheel Loader 2008 Challenger MT465B (105 HP) 4WD Tractor 2003 Kohler Detroit 400KW Diesel Generator Cummins 200KW GTA855 Natural Gas Generator 2017 CAT 335FLCR Excavator