Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


large-capacity gas turbines


large-capacity gas turbines

Inquire

Catalog #186442

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: September 29, 2026 23:35

large-capacity gas turbines

We are pleased to present the following opportunities



OPTION 1 – 2 x SIEMENS SGT5-4000F COMPLETE GAS TURBINE GENERATOR PACKAGES (BRAND NEW)

Capacity: approx. 298 MW per unit, approx. 596 MW total, 50 Hz

Year of manufacture: 2024, brand new, zero operating hours

Location: Germany

Availability: immediate

Configuration: complete gas turbine generator packages for simple cycle, with no steam turbine

Price: on request

To secure the units, the seller requires a Buyer LOI together with Proof of Funds (POF) via MT199.

OPTION 2 – 2 x SIEMENS V94.2 (SGT5-2000E CLASS) GAS TURBINE GENERATOR UNITS (USED)

Output: 138.7 MW base load / 145.7 MW peak load per unit (approx. 277 MW for both), natural gas, 50 Hz

Generator: Siemens TLR1 108/36, 173.5 MVA, 10.5 kV

Unit GT11: 3,481 starts, 152,455 EOH. Life-extension overhaul in March 2018 and a fourth major overhaul in February 2024.

Unit GT12: 4,818 starts, 148,293 EOH. Life-extension overhaul in December 2019.

Scope: complete with excitation, SFC start-up system, SPPA-T3000 controls, unit transformers and auxiliaries

Commissioned in 1995. Operating history and overhaul records are available.

Price: on request, ex-works

Our equipment offers for both options are attached in PDF format.

All units are offered subject to availability and prior sale. To release the complete technical details, serial numbers, condition reports and the commercial proposal, we require an NCNDA, LOI and Proof of Funds (POF) from the buyer side. For the SGT5-4000F units, the POF is to be provided via MT199.



Please let us know which turbine option is of most interest to your client and confirm the spare parts details above, along with the required delivery timeline and destination for the turbines. We will then coordinate the next steps.

#syne





Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

CAT 3412 DIT 470 KW Diesel Generator NovaStar, SS118, Back Pressure Steam Turbine Generator Unit, New, 7.5 MW, 13.8 kV, 60 Hz NovaStar, SS117, Back Pressure Steam Turbine Generator Unit, New, 6 MW, 13.8 kV, 60 Hz Jenbacher, J620GS-F75, 2019, 3431 kW, Natural Gas, 50 Hz MTU, 20V4000G63, 2018, 2.42 MW, 50 Hz, Diesel Mobile Generator Package Cummins, QSV91, Natural Gas Generator Set, 1,250 kW, 1,562.5 kVA, 60 Hz, 800 Hours