Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


Turbines & Power Plants — 48 Listings


Turbines & Power Plants — 48 Listings

Inquire

Catalog #186499

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: October 01, 2026 04:46

Turbines & Power Plants — 48 Listings

T01. ABB STAL GT10B Gas Turbine 24.6MW Complete Unit GT 1

Qty: 3; Year: 1995; 60 Hz; Listed rating: 24 MW; Fuel: Dual Fuel; Hours: 93.346.



Status: Available



Rating to confirm: description states 24.6 MW; rating column lists 24 MW. Hours are recorded as “93.346”; number format to confirm.



T02. ABB GT35C Gas Turbine – 21 MVA (Out of Service 2018)

Qty: 4; Year: 1995; 60 Hz; 12 MW; Fuel: Dual Fuel; Hours: 102,430.



Status: Available



T03. ABB GT-8 RBK Gas Turbine Generator Set – 49.3 MW (SGT 800)

Qty: 3; Year: 1987; 50 Hz; 49.3 MW; Fuel: Natural Gas; Hours: 155,000.



Status: Available



T04. ABB-GT10 upgraded to Siemens-SGT600 (Type GT10B1)

Qty: 1; Year: 1997; 50 Hz; 24.6 MW; Fuel: Dual Fuel; Hours: 229,087.



Status: Available



T05. Centrax CX300 1S Gas Turbine (CHP)

Qty: 1; Year: 2025; 50 Hz; 8 MW; Fuel: Natural Gas.



Status: Expected availability: spring 2027 (listed as available)



T06. GE LM6000-PB-DLE Turbine Package

Qty: 1; Year: 1997; 50 Hz; 40 MW; Fuel: Natural Gas; Hours: 74,170.



Status: Deposit Paid



T07. GE Steam Turbine (Model: 270T141)

Qty: 1; Year: 1985; 595 MW; Fuel: Steam; Hours: 261,000.



Status: Available



T08. GE Frame 5001P Gas Turbine Generator Package – 24.1 MW (1981)

Qty: 1; Year: 1981; 50 Hz; 24.1 MW; Fuel: Liquid Fuel; Hours: 69,000.



Status: Availability to confirm



T09. GE 9HA.01 Heavy-Duty Gas Turbine – 373 MW

Qty: 1; Year: 2015; 50 Hz; 373 MW; Fuel: Dual Fuel; Hours: 0.



Status: Not Available



T10. GE Frame 5 MS5001K Gas Turbine Generator

Qty: 1; Year: 1965; 50 Hz; 14 MW; Fuel: Distillate Oil - Light; Hours: 23,000.



Status: Available



T11. GE LM2500 Natural Gas (LM2500+ DLE) 1997/2019

Qty: 1; Year: 1997; 50 Hz; 20 MW; Fuel: Natural Gas; Hours: 26,800.



Status: BOP only



T12. GE Frame 5 MS5001N Power Barge – 160 MW Each

Qty: 2; Year: 1970; 60 Hz; 160 MW; Fuel: Dual Fuel; Hours: 15,500.



Status: Available



T13. GE Alsthom 9001E Gas Turbines & Rateau Steam Turbines

Qty: 2; Year: 1990; 50 Hz; 271 MW; Fuel: Multi-fuel; Hours: ~ 157,232 OH GT, ~ 130,000 OH ST.



Status: Available



T14. GE Frame 5 PG5341 (Series MS5001P – equivalent to GE Frame 5)

Qty: 1; Year: 1998; 50 Hz; 25.5 MW; Fuel: Distillate Oil - Light; Hours: 22,461.



Status: Available



T15. AEGKanis GE Frame 5 (5341N) Gas Turbine – 25.6 MW

Qty: 1; Year: 1982; 50 Hz; 25.6 MW; Fuel: Distillate Oil; Hours: 2,230.



Status: Available



T16. GE 109FA Combined Cycle Power Plant – 400 MW

Qty: 1; Year: 2002; 50 Hz; 400 MW; Fuel: Natural Gas / Gas Oil; Hours: 47,292.



Status: Availability to confirm



T17. GE Frame 9E Dual Fuel OCGT Power Plant – 243 MW

Qty: 2; Year: 2000; 50 Hz; 243 MW; Fuel: Dual Fuel; Hours: 50,642.



Status: Availability to confirm



T18. GE LM2500+ DLE Gas Turbine – 30 MW

Qty: 1; Year: 2002; 50 Hz; 30 MW; Fuel: Natural Gas; Hours: 8,185.



Status: On Hold



T19. GE LM6000 PC Gas Turbine – 46 MW (Core Only)

Qty: 1; Year: 2002; 60 Hz; 46 MW; Fuel: Natural Gas; Hours: 0.



Status: Available



T20. GE LM6000 PD

Qty: 1; Year: 2012; 50 Hz; 48 MW; Fuel: Natural Gas; Hours: 98,000.



Status: On Hold



T21. GE MS9001E & Toshiba Multi-Shaft Combined Cycle Package 310 MW

Qty: 2; Year: 1990; 50 Hz; 310 MW; Fuel: Dual Fuel; Hours: GT 121,500 upto 132,100 & ST 147,931.



Status: Available



T22. GE Frame 6B MS6001B Gas Turbine Generator Package (36.7 MVA, 60 Hz, 13.8 kV)

Qty: 1; Year: 2002; 60 Hz; 30 MW; Fuel: Natural Gas; Hours: 180,000.



Status: Availability to confirm



T23. Kawasaki L30A Gas Turbine - 34 MW

Qty: 1; Year: 2020; 60 Hz; 34 MW; Fuel: Natural Gas; Hours: 19,596.



Status: Availability to confirm



T24. Kawasaki GPB 60 PLUS Gas Turbine Generator Package

Qty: 1; Year: 2013; 50 Hz; 5.4 MW; Fuel: Natural Gas; Hours: not specified.



Status: Availability to confirm

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

For Sale - The complete Tire Shredding & Separation Line enbacher, JGS 420 GS-N.L, 2013, Containerized Natural Gas Generator Set, 1,489 kW, 50 Hz Cummins, QSV91, Natural Gas Generator Set, 1,250 kW, 1,562.5 kVA, 60 Hz, 800 Hours GE, LM2500+, 1996, Natural Gas Combined Cycle Power Plant, 26.6 MW, 50 Hz