SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


ARTIC CHALLENGER (Poseidon)


ARTIC CHALLENGER (Poseidon)

Inquire

Catalog #166258

Catagory: Ships/Vessels/Boats
Dragon's Price: CONTACT US
Date Added: March 17, 2024 20:50

ARTIC CHALLENGER (Poseidon)

Kindly note that this barge is once again available for purchase.



Enclosed is technical information regarding the system production received from the owners.



Quote.



Poseidon, is a unit to process the flow that runs from an offshore well. This flow is composed of: (a). sea ??water, (b). gas and (c). Crude oil. Ideally, Poseidon can operate in the "early production" of an offshore well. It operates in the following way:



1. Positioning



2. Connection to well through hoses that exist on board



3. Process flow separating:



a. Water to return it to the sea (EPA standard),



b. Separation of the gas for reinjection or transfer to a gas pipeline and



c. Separation of crude oil for transferring onto a tanker or pipeline



4. Storage capacity is marginal. The crude oil production passes to an onboard tank that serves as a buffer, from where it must be pumped to a tanker/oil pipeline.



5. The production capacity ranges from 8,000 bbl/day to 30,000 bbl/day, depending on the API of the crude oil and the GOR (Gas Oil Ratio) of the crude oil.



6. For a crude oil with an API Gravity of 15, it can produce around 8,000 bbl/day



7. For a crude oil with an API Gravity of 35, it can process around 25,000 bbl/day



8. Attached is a graph that correlates API Gravity / GOR with production. See attached.



The recommendation is that buyer assigns experienced crude oil process engineers to evaluate the equipment aboard Poseidon.



To carry out these operations it is necessary to add to the existing equipment pumps to pump the crude oil or reinject the gas. In each case, depending on the characteristics of the crude oil and the way in which it is intended to operate, the additional equipment may vary, for this reason it is essential that an inspection be carried out by experienced engineers.



Kind regards,



Unquote.



Price: $10,000,000 USD

Inquire
ADDITIONAL INFORMATION


People That Have Inquired On
This Item Also Liked: