SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


16/02/2025 - OFFER - GENERAL ELECTRIC FRAME 9E (PG9171) 127MW GAS TURBINE PACKAGE - FULLY UPGRADED with less than 1000 hrs


16/02/2025 - OFFER - GENERAL ELECTRIC FRAME 9E (PG9171) 127MW GAS TURBINE PACKAGE - FULLY UPGRADED with less than 1000 hrs

Inquire

Catalog #174543

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: February 17, 2025 01:51

16/02/2025 - OFFER - GENERAL ELECTRIC FRAME 9E (PG9171) 127MW GAS TURBINE PACKAGE - FULLY UPGRADED with less than 1000 hrs

We have the following to offer:

This Gas Turbine is currently not on the market or advertised. We appreciate your discretion as we do not wish to publicize this offer just yet.



STRICTLY NO MASS MAILING, NO INTERNET, NO SOCIAL MEDIA , ABSOLUTELY NO FACEBOOK OR LINKED IN



If you had to order this from GE right now it would set you back around $ 52 Million USD and a production order time of 16 months ++.



GENERAL ELECTRIC FRAME 9E GAS TURBINE PACKAGE



Our Negotiated Price Offer: $ 29.9 Million USD



Package Details:



Manufacturer: General Electric



Model: Frame 9E (PG9171)



Year of Production: 2009



Commissioning Date: 2011



Power Output: 127 MW



Frequency: 50 Hz



Condition: The gas turbine and generator were last inspected in 2018 and found to be in excellent condition. They have since been maintained in a preservation program to ensure their condition remains stable. A borescope inspection is planned to confirm this.



History:



2010: Installation of equipment



2011: Commissioning of equipment



2011-2015: Equipment mothballed



2015: NPI upgrade with Late Lean Injection (LLI)



2015-2018: Equipment mothballed



2018: NPI upgrade for power augmentation with steam injection



2018-present: Equipment mothballed



Upgrades: 2015 LLI Installation:



Wrapper modification for fuel piping



Transition pieces modified for secondary combustion



Upgrade to 24K combustion hardware



DLN skid with additional fuel valve and piping



2018 Power Augmentation Installation:



Wrapper modification for steam injection to compressor air



Steam injection control system and piping



Combustion dynamics monitoring



Upgrade to 32K combustion hardware



Upgrade of MARK VIes and generation protection panels



New HMIs



Preservation Program:



Closed-loop air circulation with dried and heated air



Active oil systems with automated temperature-based activation



Active space heaters and HVAC systems



Standstill heating generator online



Periodic oil sampling



Nitrogen blanketed piping



Monthly operation of auxiliary equipment



Bi-weekly and monthly inspections



Scope of Supply:



Gas Turbine and Auxiliary Systems



Lube and Hydraulic Oil Systems



Inlet Guide Vane System



Air Inlet and Exhaust Systems



Performance Monitoring



Cooling and Sealing Air Systems



Gas Fuel System



Compressor Washing System



Heating and Ventilation Systems



Fire Protection System



Starting System



MK VIes Control System



Generator



Additional Spare Parts and Tools



PECC Container



Interconnecting Piping and Cables



Enclosures for the GT System



Optional: Boiler Feed Water Pumps for HRSG, Wobbe Meters



Exclusions:



Compressor Building and Ventilation



Exhaust Stack



Foundation Removal



Transformers TR 9001 and TR-9002



High Voltage Cables from Generator to Transformers



Overhead Crane 50 T



Generator Circuit Breaker











Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

Solar mars 100 Price correction 2) CAT Wheel Loaders 2007 CAT CP56 84 Volvo L70D, Parts machine