SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


28/04/2025 - Power Plant Offer - Alstom GT13 DM EV 103MW Gas Turbine + Brown, Boveri & Cie Steam Turbine 50MW - COMBINED CYCLE 150MW POWER PLANT


28/04/2025 - Power Plant Offer - Alstom GT13 DM EV 103MW Gas Turbine + Brown, Boveri & Cie Steam Turbine 50MW - COMBINED CYCLE 150MW POWER PLANT

Inquire

Catalog #176290

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: May 08, 2025 23:41
Page Views: 128

28/04/2025 - Power Plant Offer - Alstom GT13 DM EV 103MW Gas Turbine + Brown, Boveri & Cie Steam Turbine 50MW - COMBINED CYCLE 150MW POWER PLANT



Sale Offer: 150 MW Gas-Fired Power Plant in Austria



Direst to exclusive agent to sell this 150 MW gas-fired power plant located in Austria.



The plant is in exceptional condition, with low operating hours and ready for immediate operation.



Below are the key details:



Facility Overview

Type: Combined Cycle Power Plant



Location: Austria



Condition: Very good, well-maintained, and operational at any time.



Capacity: 150 MW (Gas Turbine: 103 MW; Steam Turbine: 47 MW)



Efficiency: Electrical efficiency of 50%



Startup Time: Full load achievable within 25–120 minutes



Load Gradients:



Gas turbine: 7.9 MW/min



Combined block: 8.5 MW/min



Historical Highlights

1980: Facility upgraded to a combined cycle unit with an output of 125 MW. Efficiency achieved: 47.9% (world-leading at the time).



2003-2005: Replacement with a more powerful gas turbine, increasing capacity to 158 MW.



Design Excellence: Combines a gas turbine and forced circulation boiler for steam generation with a steam turbine.



Technical Specifications

Gas Turbine: Alstom GT13 DM EV (103 MW, ISO standards)



Waste Heat Boiler: Wagner Biro (dual-pressure, forced circulation design)



Steam Turbine: Brown, Boveri & Cie - BBC (50 MW, single-shaft condensing turbine with dual-pressure feed)



Grid Integration

The power generated is fed into the 110 kV grid through a dedicated substation and overhead line.



Pricing & Additional Details

Total Price (Including Spare Parts): €35 Million EUR



Spare Parts Value: €10 Million EUR (due for major turbine service in approx. 10,000 operating hours)



Dismantling Costs: €4.8 Million EUR



Transport to Port Koper, Slovenia: €960,000 EUR



Includes 10 heavy transports (total: €234,000 EUR)



Total Dismantling and Transport Cost: €5.994 Million EUR



Brand New Plant Cost Estimate: Over €200 Million EUR (calculated at €1.4M per MW for 150 MW)



Site Visit

Visits can be arranged promptly at the Austrian site. Please note that an LOI (Letter of Intent) and POF (Proof of Funds) with 5% deposit into escrow are required for appointment scheduling.



Should you have any questions or require further information, please do not hesitate to contact me. I look forward to hearing from you!



#greg

Inquire
ADDITIONAL INFORMATION


People That Have Inquired On
This Item Also Liked:

2007 CAT 330DL Long Reach Excavator Needs Repair! CAT 966K Wheel Loader 1998 Komatsu PC400LC Excavator 2003 CAT 330C Excavator 1989 CAT 950E Wheel Loader Nice!!! 2023 CAT 745 Haul Truck 2019 Dana Products SC-16 Wood Splitter Processor Quantity 20! Unused Bridgestone 23.5 R25 Tires, tires and wheels!