ABB Turbines & Industrial Systems – 75 MW Power Plant (Europe)
ABB Turbines & Industrial Systems – 75 MW Power Plant (Europe)
Overview
A 75 MW Gross Electrical Output Power Plant (50 Hz) with authorization and exclusivity for sale.
This off-market opportunity operates under a first-come, first-served basis.
Condition: Excellent, with minimal operating hours (used as a spare).
Primary Use: Electricity and process steam generation.
Previous Operations: Functioned until 2007.
Fuel Types: Originally light oil; converted to natural gas for cleaner energy.
Additional Fuel Capabilities: Fuel oil, light oil, crude oil.
Spare Parts Available
Technical Specifications
Total Area: ~10,000 sqm
Energy Output:
Gas Turbine: 45 MW
Steam Turbines: 17 MW
Own Electrical Requirements: 1.3 MW
Workforce Requirement: ~15-20 personnel
Fuel Consumption at 100% Capacity: ~14,000 Nm³/h natural gas
Heat Recovery Boiler Included for optimized energy usage
Dismantling & Transport: Turnkey reassembly available
Operational History & Upgrades
Comprehensive overhaul in 2009/10, conversion to natural gas combustion system (Ansaldo Thomassen BV).
Running Time: Approx. 3,400 OH (330 starts) post-conversion.
Decommissioned "hot" with full sale and recommissioning potential.
Technical Compliance: Meets current operational and environmental standards.
Major Components & Recent Work
Frame 6B Gas Turbine PG 6561B, LEC upgraded (Thomassen)
Alstom Generator T 214-234
GT Control System (Mark V)
Steam Turbine & Additional Burners for multi-fuel use
Heat Recovery Steam Generator
Cooling Systems, Pumps & Desalination Unit
Full Documentation Available
Investment & Pricing
Power Plant Sale Price: € 23 Million EUR
Dismantling, Transport & Reassembly (Turkey Europe): € 8.8 Million EUR
Brand New Replacement Value: € 105 Million EUR
Payment Schedule
€ 500,000 EUR Deposit (per unit) – Required immediately upon Invoice to secure order prior to SGS inspection and viewing.
50% Down Payment within 5 calendar days after inspection
Remaining Balance before shipping
Delivery: Within three weeks of site visit
Warranty: One Year Included
Additional Services (Optional)
Installation & commissioning assistance
Personnel training on turbine operation & maintenance
Collaboration & Next Steps
1. Sign NCNDA (Non-Circumvention, Non-Disclosure Agreement)
2. Submit LOI & Proof of Funds
3. Contract preparation & transaction execution
Site Visit & Documentation
Short-term visits available (subject to LOI, POF, NCNDA and deposit into escrow)
Comprehensive documentation & technical package available upon request
Serial numbers confirmed upon order placement
Offer Validity: Subject to prior sale. If interested, please act quickly to secure this opportunity.
#mega