SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


GE PG6516B Turbine - Ref : P/AA-87 -18.7


GE PG6516B Turbine - Ref : P/AA-87 -18.7

Inquire

Catalog #177873

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: 6,000,000.00 USD
Date Added: July 21, 2025 22:27

GE PG6516B Turbine - Ref : P/AA-87 -18.7

GE PG6516 B,Year:2000,hours:22379,10.5kv,50hz,Natural Gas,power:39.62 MW



Price : USD 6,000,000 FOB China Port



Immediate Delivery



2 # Gas Turbine PG6561B Situation Description



The existing 2 # gas turbine is a PG6561B gas turbine produced by Nanjing Gas Turbine Motor (Group) Co., Ltd. The generator is a QFR-38-2 produced by Nanjing Steam Turbine Factory, and the control system is MKVIe. The rated power of the unit is 39.62MW (natural gas), the rated speed is 5133r/min, the rated turbine exhaust temperature is 532 ?, the heat consumption rate is 11480KJ/KWh, the factory number is 200101, and the product serial number is 00418.



This unit was relocated from Dalian Gas Turbine Power by Kefeng Thermal Power in 2011. It was invested and constructed in May 2000 and completed in November 2001. After completing the "72+24" hour trial operation, it was shut down and ceased operation in December 2007. The fuel used for unit debugging is 180 # heavy oil and diesel.



In 2013, during the second phase of construction, the unit underwent a "oil to gas" transformation, using DLN1.0 low nitrogen burners. Since its launch, a total of 24558 hours of ignition operation have been carried out, including 22379 hours of premixed combustion operation, with a total of 1250 start stop cycles. The unit underwent a medium maintenance in 2017 and commissioned GE Qinhuangdao factory to repair the secondary fuel nozzle (duty flame nozzle) and turbine primary nozzle. The flame tube, transition section, and turbine primary moving blades were inspected.



The second intermediate maintenance will be carried out in April 2024, which will repair the flame tube, transition section, turbine first stage nozzle, first stage moving blades, and second stage moving blades, and conduct on-site inspections of other hot channel components.



#ss





Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

2001 CAT 325C Excavator 2013 Volvo 250D Excavator (3) Toyota 8FBCU30 Forklifts 2020 Deere 750L LGP Dozer 2004 Volvo 330BLC Excavator 2021 CLARK S32C Forklift 2020 Grove GMK-4100L-1 (115 Ton) All Terrain Crane