SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


MEGA HOT SALE:4 (Four) Pratt & Whitney F4 Twin-pack


MEGA HOT SALE:4 (Four) Pratt & Whitney F4 Twin-pack

Inquire

Catalog #178552

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: August 21, 2025 21:49

MEGA HOT SALE:4 (Four) Pratt & Whitney F4 Twin-pack

These are expected to be sold by the weekend

Unbeatable price

4 (Four) Pratt & Whitney F4 Twin-pack

* Model A-9

* 21/42MW @ISO

* Dual fuel NG adaptable/light distillates

* Single Cycle: 34-35% efficiency

* Low yearly fired hours (200-500)

* Offline 6/2023, documented, tested, and fully operational when taken offline.

* EM Synchronous Generator S/N 469195711

* 45MVA, 60 Hz

* 3600 RPM, 2 poles

* 13,800V, 1945 Amps, Power Factor (PF) 0.90, 41,850kW

* Temp rise Armature (rotor) 60 Celsius.

* Temp rise Field (stator) 85 Celsius



Engine Hours



* Unit 11 A: 11,164.5

* Unit 11 B: 11,681.4



* Unit 12 C: 10,682.2

* Unit 12 D: 10,823.1



* Unit 13 E: 10,489.9

* Unit 13 F: 10,825.4



* Unit 14 G: 10,359.6

* Unit 14 H: 10,516.8



With less than 1,000 hours of operation since major overhaul, these turbines represent assets with

substantial remaining useful life. Industry standards suggest:



* Expected service life of 25+ years with proper maintenance

* Approximately 25,000-30,000 hours between major overhauls

* Current condition places units at the beginning of their post-overhaul lifecycle

* Potential for 20+ years of service before requiring another major overhaul



Furthermore, there are 3 years of spare parts included in the deal. Extra Engine etc.



They are priced aggressively. We are now in the dismantling phase.



Total Package Price is $16 m for 168 MW. (FIRM)



DIRECT TO OWNER



#jturb



Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

6 in 1 600W (1200W Peak) Portable Power Station. 500 Units.   EXW Los Angeles $125.00 Unit. Retail $269.99 3-2011 Capacity TJ5000 Spotters fr9