We currently do not have any TM2500s they sell virtually the day they come on market.
We currently do not have any TM2500s they sell virtually the day they come on market.
Would LM 2500 work for you? If so, please see the info on the units we have available below.
Needless to say these will sell VERY quickly
TWO GE LM2500 units (year 1999, <20,000 hours, 25 MW). The inspection report was originally in Chinese, and the English translation is below
Inspection Summary – GE LM2500+ Gas Turbines
Report No.: 114064
Issued by: Taiwan Power Company, Department of Power Equipment Repair and Maintenance, Non-Destructive Testing/Mechanical Laboratory
Inspection Date: November 10, 2025
Engines Inspected: GE LM2500+ Gas Turbines, Serial Nos. 565-103 and 565-104
Method: Visual Examination (borescope) using Olympus iPLEX NX Ø6 mm × 5 m
Scope of Inspection
* Compressor Section: Stages 0–2, 11–12
* Combustor (including fuel nozzles)
* High-Pressure Turbine (HPT) Section
* Power Turbine – 1st Stage Nozzles
* Inspection Ports Used:• Engine 565-103: 19 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
* Engine 565-104: 18 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
Results
Engine Serial No. 565-103
* Compressor section: No abnormalities
* Combustor (incl. nozzles): No abnormalities
* HPT section & Power turbine 1st stage nozzle: No abnormalities
Engine Serial No. 565-104
* Compressor section: No abnormalities
* Combustor (incl. nozzles): No abnormalities
* HPT section & Power turbine 1st stage nozzle: No abnormalities
Technical Notes
* Surface Condition: Uncleaned (as-is)
* Illumination: >1,076 lx (adequate for fine defect detection)
* Judgement Standard: QT-QS-091, Rev. 5
* Final Judgement: Both turbines “No reportable indications” (defect-free)
Archival & Business Value
* Confirms both LM2500+ turbines are in sound condition with no defects.
* Provides photographic evidence and diagrams (22 pages total).
* Serves as official documentation for maintenance records, warranty claims, operational readiness certification, or dispute resolution.
In short: Both GE LM2500+ turbines (Serial Nos. 565-103 & 565-104) passed borescope inspection with no abnormalities detected.
Price for core engine: € 7.5 million each
Price for full package including new Gear box, control panel, alternator: €16.5 million each
An LOI, POF and 30% refundable deposit into escrow is required prior to inspection