Wärtsilä, Siemens, GE, CAT, MAN - Diesel, Gas, HFO Plants
Wärtsilä, Siemens, GE, CAT, MAN - Diesel, Gas, HFO Plants
We are pleased to present a selection of high-quality power generation plants and generator sets available for sale.
Please find the details below:
1. Wärtsilä HFO-fired Power Plant
• Gross Capacity: 107.088 MW
• Net Capacity: 100 MW
• Operation Mode: Peaking Load
• Fuel: Heavy Fuel Oil (HFO)
• Year of Manufacture: 2011
• Running Hours: 44,660 – 55,477
• Note: Configured for 50 Hz, can be converted to 60 Hz
2. Unused 60 Hz Wärtsilä Diesel Generator Sets
• Engine Type: W16V32
• Quantity: 6 units
• Power Output: 7,680 kW per unit
• Frequency: 60 Hz
• Complete auxiliaries and supporting equipment
3. Wärtsilä W18V32 Diesel Plant
• Capacity: 36.45 MW (5 units)
• Year: 2001
• Running Hours: ~22,000 per unit
• Fuel: Heavy Fuel Oil (HFO)
• Generator: ABB Synchronous, 13,800 V, 60 Hz
4. Wärtsilä W20V34SG gas engine power plants
with a total installed capacity of 116 MW.
All units are in running condition and can be converted to 60 Hz operation, if required.
PLANT 1 – Ref. 118A-MN (34 MW)
Configuration: 4 × W20V34SG
Year of manufacture: 11/2008; COD: June 2009
Running hours after last 16K overhaul:
• Genset 1: 6,146 h
• Genset 2: 8,061 h
• Genset 3: 16,765 h
• Genset 4: 16,176 h
PLANT 2 – Ref. 118B-RP (34 MW)
Configuration: 4 × W20V34SG
Year of manufacture: 11/2008; COD: June 2009
Running hours after last 16K overhaul:
• Genset 1: 15,178 h
• Genset 2: 6,556 h
• Genset 3: 9,652 h
• Genset 4: 7,797 h
PLANT 3 – Ref. 118C-JN (34 MW)
Configuration: 4 × W20V34SG
Year of manufacture: 11/2008; COD: June 2009
Maintained under Wärtsilä LTSA
Running hours after last 16K overhaul:
• Genset 1: 16,606 h
• Genset 2: 20,062 h
• Genset 3: 19,342 h
• Genset 4: 17,433 h
PLANT 4 – Ref. 118D-CN (14 MW)
Configuration: 2 × W16V34SG
Year of manufacture: 2006; COD: 14 November 2006
Running hours after last 16K overhaul:
• Genset 1: 5,583 h
• Genset 2: 13,676 h
Frequency Conversion Capability
All engines (W20V34SG and W16V34SG) operate at 900 rpm, allowing conversion to 60 Hz operation with appropriate generator and control system modifications.
5. Siemens SGT-500 Gas Turbines
• Quantity: 2 units (never used)
• Year: 2007
• Power Output: 17 MW each
• Fuel: Dual fuel (Natural Gas / Diesel)
• Frequency: 50 / 60 Hz
• Includes generators, gearboxes, lube oil systems, and complete skid package
6. Siemens SGT5-2000E Combined Cycle Plant
• Capacity: 670 MW (3 x SGT5-2000, each 166 MW + 3 x steam turbine, each 57.3 MW)
• Turbines: SGT5-2000E, dry low NOx, zero operating hours
• Includes: Steam turbines, HRSG, auxiliaries, BOP, transformers, control systems, and all major components
Note: Configured for 50 Hz, can be converted to 60 Hz
7. GE Frame 9FA CCGT Plant
• Capacity: 2 × 750 MW blocks
• Status: Installed but not commissioned
• Equipment includes: Gas turbines, steam turbine, HRSGs, transformers, DCS, cooling towers, auxiliaries
• Fuel: Dual fuel
• Frequency: 50 Hz (convertible to 60 Hz)
• Warranty: Eligible for reactivation
8. MAN 18V48/60 TS Diesel Plant
• Quantity: 3 units
• Power Output: 19,305 kW per unit
• Fuel: Diesel, convertible to HFO
• Frequency: 50 Hz
• Average Running Hours: 5,000–6,000
• Includes BOP, alternators, charge air systems, compressors, radiators, and control
9. Siemens Westinghouse W701DS Gas Turbine Power Plants
• Quantity: 2 units (fully overhauled, zero hours)
• Nominal Capacity: 127.8 MW per unit (50 Hz)
• Fuel: Dual fuel – Natural Gas / Distillate Oil (HFO compatible)
• Efficiency: 32% simple cycle, up to 52% combined cycle
• Independent enclosures with inlet filtration, anti-icing, water injection for NOx abatement
• Full TurboCare SpA overhaul including rotor/stator and performance upgrade
• Scope of Supply: Gas turbine, hydrogen-cooled generator, control & electrical packages (MCC, 6 kV board, protective relays, auxiliary transformer), inlet & exhaust systems, mechanical and cooling packages, firefighting, enclosures, documentation (O&M manuals, layouts, P&ID, single line diagrams)
• Exclusions: Generator step-up transformers, HV substation, DCS, tanks, fuel treatment systems, and other site-specific utilities.
10. New & Unused Siemens SGT5-4000F Gas Turbine & Generator
Heavy-duty, single-casing, axial-flow design, dual-fuel gas turbine suitable for industrial power generation. Stored and maintained under strict supervision by Siemens AG.
• Manufacturer: Siemens AG
• Model: SGT5-4000F
• Year of Manufacture: 2016
• Frequency: 50 Hz
• Fuel: Natural Gas (NG) / Diesel Oil (DO)
• Gross Power Output:
• 298.2 MW (NG)
• 301 MW (DO)
• Gross Heat Rate:
• 8979.3 kJ/kWh (NG)
• 9538.5 kJ/kWh (DO)
• Generator: SGEN5-1200 A
Included:
• By-pass stack
• Diverter damper
11. Caterpillar Generator Sets
• CAT 3412C (2014, unused) – 9 units, 810 kVA / 648 kW, 50 Hz
• CAT 3406C (2014, unused) – 5 units, 275 kVA / 220 kW, 50 Hz
• CAT 3516 (1.6 MW, 50 Hz) – 3 units, 488 hrs
• CAT 3516B (1.6 MW, 50 Hz, 2016) – 2 units, diesel
• CAT 3516H (2–2.5 MW, 50 Hz) – 7 units, gas engine, YOM 2025/2026
• CAT 3516 (1.2–1.5 MW, 60 Hz) – 15 units, diesel
• CAT G3516H (2025/2026, 50 Hz) – 2 units
• CAT G3516H (50 Hz) – 3 units, stock available
• CAT G3520H (2023/2025/2026, 50 Hz) – 4 units, gas
• CAT G3520C (2007, 50/60 Hz) – 3 units, low energy gas / biogas / coal gas
12. GE Frame 9E Gas Turbine Package (PG9171) with Sequential DLN and Power Augmentation.
The unit was manufactured in 2009, installed in 2010, and commissioned in 2011. It has an original net output of 127.214 MW at 15 kV, 50 Hz / 3000 rpm, and is equipped with a Brush 15 kV generator and Mark VIeS control system.
The unit has been in preservation since 2018 and has very limited operating history, with less than 500 fired hours and under 100 starts. It was last inspected in 2018 and found in excellent condition. A borescope inspection can be arranged upon request.
Key upgrades include:
• 2015: Low Emissions (LLI / DLN enhancement) upgrade
• 2018: Power augmentation system with steam injection (HRSG-based)
• Control and protection system upgrades (Mark VIe, HMI, monitoring systems)
The equipment has been maintained under a strict preservation program including controlled environment, oil system maintenance, nitrogen blanketing, and regular inspections.
The offer includes the complete gas turbine package, generator, control system, auxiliary systems, PECC container, interconnecting piping and cables, as well as spare parts and tools. HRSG integration systems and steam augmentation equipment are included.
Major civil works, transformers, HV cables, and grid connection equipment are excluded.
Full technical documentation and detailed data package are available upon request.
All units are subject to prior sale. Inspection, documentation, and photos are available upon request.
#eveli