Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


An advanced-stage SAF / renewable fuels project in Rotterdam, NL is now available for acquisition and completion, either for in-place operations or relocation.


An advanced-stage SAF / renewable fuels project in Rotterdam, NL is now available for acquisition and completion, either for in-place operations or relocation.

Inquire

Catalog #182938

Catagory: Petroleum Product
Dragon's Price: CONTACT US
Date Added: May 02, 2026 23:31

An advanced-stage SAF / renewable fuels project in Rotterdam, NL is now available for acquisition and completion, either for in-place operations or relocation.



This is a fully engineered HEFA complex that progressed through EPC with equipment already fabricated, delivered, and bulk materials largely procured.



Project Snapshot



820,000 TPA renewable fuels capacity

16,000 BPD HEFA conversion unit

3,000 TPD pretreatment (Alfa Laval)

65,000 Nm³/hr. hydrogen plant (Linde, SMR-based, low carbon with carbon capture)

Integrated with:



Tank farm and storage infrastructure

Fired heater (Axens / Heurtey)

Gas treatment (Thiopaq – Paqell)

Siemens substation and electrical systems

Full utilities and offsites

A substantial portion of the project has already been executed, with 90% of bulk materials procured and key equipment fabricated and delivered.



Why this is different?



Most SAF projects today are constrained by:



Hydrogen availability

Long-lead equipment

Permitting and timelines

A large part of the engineering, procurement, and long-lead equipment is already in place, so this is not a typical greenfield starting point. Given the status, this can materially shorten development timelines compared to a typical greenfield SAF project.



How it can be approached?



Depending on your strategy, the opportunity can be evaluated as:



Completion in Rotterdam - Leverage the existing site and advanced project status

Relocation of the full project - Redeploy the complete project to another site to accelerate development

Acquisition of individual units - Particularly hydrogen, pretreatment, fired heater, and gas treatment for integration into existing assets

Next Step



If this is of interest, we suggest a preliminary email to walk through the project and discuss fit.

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

33000 drums Marine engine oil Canceled Project Liquidation - Sustainable Aviation Fuel Equipment OIL EQUIPMENT FOR SALE PIPELINE OFFER USA LEASING OPTIONS: Some equipment can be leased.