Gas Turbine power plant H-25 x 2sets 32mw x 2 units 60hz 13800v 2012, operation start 2014, stop operation 2023 at the time of abt. 21000 hours.
Gas Turbine power plant H-25 x 2sets 32mw x 2 units 60hz 13800v 2012, operation start 2014, stop operation 2023 at the time of abt. 21000 hours.
460 MB of photos and details can be sent by Wetransfer on request
Stock in Japan
For sale Mitsubishi hitachi gas turbine generator
H-25 32Mw x 2 units 64Mw 2012 model, start operation 2014, stop operation 2023 at the time of hour meter abt.21000 hours.(actual hour meter to be refer the data download
Storage location in Japan
Still foundation but already started dismantling from 1st Aug., 2026
Finish the dismantle till end of Sep., 2026
2 units package sale.
Price at Usd 8.9 million fob Kobe for two units.
Scope of supply Engine, alternator, gear box, control room , auxiliaries equipments including inside of generator room , fire fighting device, 2 units each.
Qubicle, cooling tower, transformer each 1 unit.
HRSG, Big Exhaust air ducts for front and back side of enclosure are out of scope.
Since two units package deal, cannot sell one unit separately.
Inspection can be done now through already started dismantle.
See below the terms for inspection
During dismantle, removing equipment to be deliver to Kobe port yard to storage all equipment till shipment time, all equipments must remove from factory till end of Sep., 2026.
¦Basic information
Commodity :Used Gas Turbine power generator sets
Model :H-25
Built :2012
Volume :2sets
Frequency :60Hz
Brand :Mitsubishi Hitachi power
Hours :Please download from the link Pictures :Please download from the link
Specification :Please download from the link
Can make contract with seller in Japan who can accept LC payment for the balance after escrow deposit of 5%
balance payment directly by LC can be arranged IF acceptable bank.
H25 x 2 units 32 x 2 64Mw 2012 60hz
Additional reply.
1.Price is Usd 8.9 millon for two units package fob Kobe.
Seller cannot negotiate the price.
2.Reason of sale is to replace the new power plant.
3.Operation histories mentioned on data download (No overhaul done due to still enough period of next overhaul time around 40,000 hours)
4. Fuel: Gas
5. Serial number can ifm when you are interested in purchasing and After LOI contingent on same.
6. Scope of supply
Generator ,control system, fuel system except fuel tank,starting system, inlet/exhaust system except big exhaust air duct, dubu oil system, electrical equipment , transformer, Qubicle, cooling tower and auxiliaries are included.
Switch gear for frequency change are not included .
7. Dismantle work is done by professional Co by Seller who has well experience
of dismantling and relocating the power plant and industrial factory machinery and plant.
8. Drawing, diagram, manual etc can check only at the time of inspection.
9. Insulation and recommission matter can discuss after you decide to purchase firmly.
10. It is a very good deal first in first served expected to sell Fast
#papi