For sale: Available Gas Turbine Equipment – Current Sales List
For sale: Available Gas Turbine Equipment – Current Sales List
Please find below our suppliers current list of available gas turbine and power-generation equipment, including 60 Hz, 50 Hz and other available options.
Kindly review the list and let us know which units may match your current buyer requirements.
For any equipment of interest, please identify the model and required quantity, and we will coordinate the next steps and obtain the detailed technical and commercial information.
AVAILABLE GAS TURBINE EQUIPMENT
SALES OFFER & INVITATION FOR PURCHASE INTEREST
We are pleased to present the following currently available and/or actively offered power-generation equipment for review by qualified project owners, buyers and authorized purchasing representatives. Please select any turbine(s) relevant to your project requirements and submit your purchase interest together with the requested project information and financial capability documents listed at the end of this offer.
Important: Availability, final technical configuration, location, price, inspection terms and scope of supply are subject to reconfirmation at the time of a formal inquiry. All equipment is offered subject to prior sale and final commercial confirmation. No equipment shall be considered reserved until the applicable commercial procedure has been completed.
SECTION A — 60 Hz / 60 Hz-CAPABLE GAS TURBINES
No. Manufacturer / Model Qty. Output Frequency Condition / Notes
1
Siemens SGT-800
6
56 MW each
60 Hz Brand new package opportunity; offered as complete package
2
Siemens SGT-800
4
55 MW each
50/60 Hz 2025; dual fuel; delivery stated at approx. 5–6 months
3
Siemens SGT-800
1
54 MW
50/60 Hz Factory new; immediate-delivery listing
4
Siemens SGT-600
Available 24.5 MW
each
50/60 Hz Unused / zero-hour opportunities available
5
GE TM2500+ Gen 6
2 ~32 MW
each
50/60 Hz
Mobile/aeroderivative opportunity
6
GE Frame 6B / Frame 6
1+
~37–40 MW
60 Hz Natural-gas units; condition varies by unit
7
GE Frame 5PA / MS5001
2 opp.
~26–30 MW
60 Hz Including never-installed / unused opportunities
8
GE LM2500
2 ~26 MW
each
60 Hz
Rebuilt/used; dual-fuel opportunity
9
GE LM2500 Gen 1 Mobile
2 18 MVA
each
60 Hz
Trailer mounted; used
10
GE PG7241FA / Frame 7FA
2 Large frame class
60 Hz
Natural gas; DLN; used
11
GE Frame 7EA / 7E class
Available
~80–85 MW
60 Hz Multiple opportunities; condition varies
12 Westinghouse 501B 2 73 MW each 60 Hz Used; dual fuel
13
ABB GT10B
3 ~24.6 MW
each
60 Hz Used; overhaul/condition confirmation required
14 Siemens SGT-A35 / GT30 2 ~34–38 MW 50/60 Hz Used opportunity
15 Solar Taurus 60 1 ~5.2 MW 60 Hz Industrial gas turbine
16 Siemens SGT-300 1 opp. ~7.9 MW 60 Hz Industrial gas turbine
17
Rolls-Royce Avon 76
2 ~12.5 MW
each
60 Hz
Used
18
Rolls-Royce 501-KB5S
3 ~3.8 MW
each
60 Hz
Refurbished
SECTION B — 50 Hz GAS TURBINES
No. Manufacturer / Model Qty. Output Frequency Condition / Notes
1
Siemens SGT5-2000E / V94.2
3 blocks ~223
MW/block CCPP
50 Hz
2015; zero-hour opportunity; 1×1 combined-cycle blocks
No. Manufacturer / Model Qty. Output Frequency Condition / Notes
2
Siemens SGT-600
9 24.5 MW
each
50 Hz
2000; 11 kV; DLE; used
3
Siemens SGT-600
6 24.5 MW
each
50 Hz Dual fuel; high operating hours; conversion may be evaluated
4
Siemens SGT-800
2 47.5 MW
each
50 Hz 2012; combined-cycle plant equipment; availability to reconfirm
5 Siemens SGT-800 1 47.5 MW 50 Hz 2007; upgraded A+ type; used
6
Solar Titan 130
1
~15 MW
50 Hz Low-hour opportunity; SoLoNOx / dual-fuel details subject to confirmation
7
Solar Titan 130
3 ~15 MW
each
50 Hz Low-hour opportunity; conversion feasibility to be evaluated
8 MAN MGT6000-1S Available 6.5 MW each 50 Hz 2026; new / unused package
9
GE Frame 6B
2
~39.8 MW
each
50 Hz Combined-cycle plant; major overhaul/warranty terms to reconfirm
10
GE LM2500+ SAC
1 opp. ~22–30 MW
class
50 Hz Used; 60 Hz conversion may be evaluated
SECTION C — OTHER / CONVERTIBLE / SPECIAL POWER-GENERATION OPPORTUNITIES
No. Manufacturer / Model Qty. Output Frequency Condition / Notes
1 Pratt & Whitney Mobile Gas Turbine Packages
2 ~25 MW
each
50/60 Hz Mobile package opportunity; full configuration to reconfirm
2 GE LM2500 Gas Turbine Packages
3 ~22 MW
each
50/60 Hz Low-hour / special opportunity; configuration to reconfirm
3 Siemens SGT-800 Combined-Cycle Packages
Multiple 44–56 MW
GT class
50/60 Hz Various package configurations; some may be package-only
4
MWM TCG 2032 V16 Gas
Engines
Multiple
4.3 MW
each 50 Hz / conversion review
Gas engines, not gas turbines
5 Caterpillar G3520H Gas Engines
Multiple 2.5 MW
each 50/60 Hz
opportunities Gas engines; new/unused opportunities
6 Caterpillar G3520C Gas Engines
9 1.95 MW
each
50 Hz
Natural gas; zero-hour listing
7 Jenbacher J620 Gas Engines
2 3.5 MW
each
50 Hz
Gas engines
HOW TO EXPRESS PURCHASE INTEREST
• Select the exact turbine model(s), quantity and preferred frequency from the above inventory.
DO NOT reply asking for more then one . We will only reply to one selection per email
• State whether the requirement is for simple-cycle, combined-cycle, mobile generation or another configuration.
• Provide a formal LOI / purchase request identifying the selected equipment and required delivery schedule and end user country.
• Provide verifiable answers to all 15 project questions below.
• Can you provide acceptable proof of funds (POF) for the approved project budget when requested.
• Following initial qualification, detailed technical documents, commercial terms, inspection arrangements
and the next transaction steps can be coordinated for the selected equipment.
MANDATORY BUYER / PROJECT INFORMATION — REQUIRED FOR EVERY REQUEST
No. Required Information Buyer Response
1
What is the ultimate destination of the equipment?
2
Do you have a fuel supply secured?
3 How far is your fuel connection point or pipeline from your proposed project location?
4
Do you have the necessary permits for construction?
5
Do you have a power purchase agreement in place?
6 Do you have a site that has received environmental approval and is fully permitted?
7 What is your timeline? When do you estimate that a final purchasing decision will be made?
8
When do you need this machine?
9
When do you need to purchase it?
10
When do you need it delivered?
11
Can you supply a proof-of-funds letter?
12
What is your full physical address?
13
What is your budget for this project?
14
Has the budget amount been approved?
15 Can you send us a proof-of-funds (POF) letter for the approved budget?
Commercial Notice: The equipment listed in this offer is available for sale to qualified buyers. Availability, technical specifications, price, scope of supply, inspection and delivery terms will be reconfirmed upon formal inquiry, verification, seller confirmation and mutually acceptable transaction documentation.
Buyers should not rely on indicative specifications without reviewing the final technical package.
#masterby