LIST of Secondary Market Turbine Packages for Sale
LIST of Secondary Market Turbine Packages for Sale
Simple Cycle and Combine Cycle Packages
In Storage and Available for Immediate Delivery
TAH owned: 2-GE 7EA GTG packages (85mw ISO each)
TAI Exclusive: 2-GE 7F.05 GTG packages (225mw ISO each)
TAI Exclusive: 1-GE 7F.05 GTG packages (225mw ISO)
TAI Exclusive: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160mw ISO)=360MW in Combine Cycle.
TAI Exclusive: 1-Rolls-Royce Trent Turbine and 1 Siemens SST300 STG=77MW in Combine Cycle
TAH owned: 1-GE LMS100 GTG package (100mw ISO)
2 GE 7EA (PG7121) GTG packages (85mw ISO each)
OUTPUT: 85MW ISO on natural gas
Heat Rate: 10,430 Btu/Kwh
Current Fuel Set Up: Dual Liquid Fuel:
1. Crude(Primary Fuel) and Distillate (Back up)
Can be converted to natural gas for an additional cost.
Utilizing water injection NOx combustion technology
Single nozzle combustion system
MARK VI Control System
Generator (ELIN) Totally Enclosed Water to Air Cooled
60Hz, 13.8kV, .95 Power Factor Capable
Zero ''0'' Hours, Never Used
2xGE 7F.05 GTG packages, Built in 2016
(450mw TOTAL: 225mw ISO each)
Zero ''0'' Hours, Never Used
DLN 2.6+ Combustion Technology
GE Mark VIe Control System
Water-to-Air Fin Fan Cooling
7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers
Static Starter - one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs
2-Exhaust stacks with silencer: 19.5 feet diameter and 135 feet height
Ancillary equipment
Lube oil conditioner
Complete GE engineering package
1xGE 7F.05 Gas Turbine Generator Package 225MW
One GE 7F.05 Gas Turbine Generator Set
Built in 2014, Zero ''0'' Hours, Never Used
DLN 2.6+ Combustion Technology
GE Mark VIe Control System
Water-to-Air Fin Fan Cooling
7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers
Static Starter - one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs
Ancillary equipment
Lube oil conditioner
1 on 1 Combined Cycle Assets: 77MW as Site Conditions
Rolls-Royce Gas Turbine Generator Package
Siemens SST-300 Steam Turbine Generator
ROLLS ROYCE USA, OHIO MANUFACTURED TRENT 60 GAS TURBINE GENERATOR SET.
• Manufactured in 2016, delivered in August 2017
• 60MW AT SITE CONDITIONS
• DLE Dry Low Emissions
• Cold start to full power in under 10minutes
• 50Hz, but easily convertible to 60Hz
• Engine still preserved in original shipping container
• An aeroderivative gas turbine.
SIEMENS STEAM TURBINE GENERATOR SST-300 C2S/C160
• Manufactured in 2016, delivered in August 2017
• Output 17.92MW AT SITE CONDITIONS
• Speed 7059 RPM
• Admission Steam Temperature 400 Degrees C
• Admission Steam Pressure 30 bara
• Exhaust Pressure 0.07 bara
• Rotation- Right; Seen in Steam Flow Direction
1 on 1 Combine Cycle Asset: 360MW
1xSGT6-5000F and 1xAlstom Steam Turbine Generator
1 on 1 Combined Cycle: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160MW ISO)
GT Built in 2008 and STG Built in 2006, both never used=Zero ''0'' Hours
Unused GE LMS100 GTG Package
Never Used, Zero ''0'' Hours
Package built in 2009
Can be converted to Dual Fuel and 50Hz at minimal additional costs
We can quote an AS NEW package or Turnkey EPC Installed Number
Prices and more detail strictly only for genuine RWA projects we must have named destination not for mass mail or Internet