Alstom Frame 9171 132MW Turbine - Ref : P /C2 -1681


Alstom Frame 9171 132MW Turbine - Ref : P /C2 -1681

Inquire

Catalog #148404

Catagory: Plant and Equipment  -- Oil And Gas
Dragon's Price: CONTACT US
Date Added: July 12, 2022 00:18
Page Views: 413

Alstom Frame 9171 132MW Turbine - Ref : P /C2 -1681

We are pleased to enclose details of 2 nos Alstom Frame 9 Turbine .

These are available immediately .

Price : Will be quoted upon request with named end user destination

ALSTOM FRAME 9 GAS TURBINES



Frame-9 ALSTOM Gas Turbines

2 Units Available

Model 9171 E

Background:

GT No: 8: Installed in the year 2000, was operational until end of 2007. Then the unit shut down normal and kept standby. Later, few spare parts had removed from this unit including cooling water radiator to install in another site. Currently, all removed parts including radiator assembly have been returned and installed in place.

GT No: 9: Installed in the year 2003, was operational until end of 2008. The unit shut down normal and kept standby.

In the year of 2008 onwards Owner did not require power generation from these GT units, Since then both GT units remained idle in the existing location. No preservation was done for the plants for long term shut down. Subsequently, Owner withdrew all the staff from the station, station supply disconnected, liquid fuel connections removed and disconnected the gas supply and removed gas fuel ESD valve.



Operational and Maintenance History of the Units:

The operational data is given below:

Unit GT: 8 Unit GT: 91GE Gas Turbine TURCO-T9E1482 Model PG 9171 E3 Manufacture Date 2000 Feb-024

Commissioning Date 26/7/008/3/035 Last Run Date 29/1/0826/5/086 Total Fired Hours 21669.413665.97 Gas Fired Hours 541.91544.48 Distillate Fired Hours 21148.912777.79

Manually Initiated Starts27514310

Total Starts 32916511

Emergency Trips 642012

Peak Load Fired Hours 2.6

GT-8:

During the above operational period, two combustion inspections had been carried out an interval of 7000 operating hours and one hot gas path inspection carried out at 21660 hours. During HGPI, all the crossfire tubes, combustion liners, transition pieces, first and second stage nozzles, and first stage buckets were replaced.

GT-9:

During the above operational period, one combustion inspection had been carried out an interval of 7000 operating hours. Both units did not face any abnormal operational issues or breakdown maintenance.

Generator Unit GT: 8 Unit GT: 91OEM Alstom

Alstom 2 Unit GT8 GT93 GT Type Frame. 9 Frame.

94 Generator Type T 240-370T 240-3705

Rating 122 MVA165 MVA6 Voltage 15k V15k V7Pf0.80.88

Frequency 50 Hz 50 Hz 9

Excitation Brushless Brushless 10 Cooling TEWACTEWAC

Dismantled and Ready to Ship.

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

68 units - 2014 Wabash Reefers 2019 Capacity TJ6500 6X4 DOT Spotter 2019 Capacity TJ6500 6X4 DOT Spotter 74 units of - 2014 Wabash Reefers Eagle 36” x 30’ Log Washer 200 units (17 pallets) of this concrete mixer brand new available out of GA USA.